This blog is Matt Denton's build diary for the 1.9Te Turbo Diesel powered Mantis Robot walking machine.
Wednesday, 25 November 2009
3 Phase installed
3 Phase power has been installed today, now we can get on and test the pump :), although we can only run it for a second or two, as we have no oil in the reservoir yet, only a bit left in the pump from the manufacturers test.