Tuesday 9 March 2010

Leg rebuild begins..

We started to put the leg back together today. So far we have replaced the rams, including the new red end bearings. Ncxt job is to replace all of the Igus spherical bearings with steel on PTFE type. We have also ordered the new hydraulic hose set, in Flexor 7, this hose is much lighter than standard twin braid, however, it has a lower working pressure of 155 bar.