Thursday 3 February 2011

Electronics / Loom installation

I have spent a bit more time working on the installation of each legs various looms and control box's VIC-E and SID. I have been putting this job of for a whil, partially because its been too cold to work in the main workshop, and partially because its a bitch of a job! Anyway, all the encoders are now wired up and connected and the looms are in place. All apart from the 5 leg which requires parts from the test rig once it is stripped down.

Installing the leg looms and wiring up the encoders.